Case Studies

Medical equipment manufacturing worker.

Nordson Medical DTMA

Valuable Insights from a Digital Transformation Maturity Assessment (DTMA)

Image of two production workers at a pharmaceutical manufacturing plant.

Tier 3 Pharmaceutical Supplier

Reducing batch corrections and improving efficiency.

Electric meters similar to the ones connected to the Canary Historian for data collection.

The Borough of Chambersburg

Improving Efficiency with data and a Canary Historian

Machine cutting tool.

Mid-size OEM of compressors and welding/cutting equipment

Compressor OEM improved levels of service, equipment performance, and operational efficiencies.

Power supply manufacturing.

UNIVERSAL ELECTRIC CORPORATION

We need to track changes to the documents, and to check, modify, and close out the document changes.

CNC machine similar to the one in this case study that needed real-time data to reduce downtime.

CNC Shop Manufacturer

Reducing excessive machine downtime.

Bayer Healthcare, medical device manufacturing.

Bayer Healthcare

The software developer doesn’t work here any more.

Wood product manufacturer producing OSB boards with a large press.

Estimated Life Remaining Calculation Reduces Expensive Downtime

Company is a wood products manufacturer creating OSB board with a very large press.

Tier 1 automotive supplier.

Tier 1 Automotive Supplier

Down-time and OTD addressed with asset monitoring for Tier 1 Automotive Manufacturer

Pennatronics, electronics contract manufacturer.

Pennatronics

In need of custom application support.

Henry F. Teichmann, Inc. Glass Manufacturing.

Henry F. Teichmann, Inc.

We need to continually improve. 

Cable/Wire machinery.

Small Manufacturer, builds wire and cable solutions

Unplanned downtime has been reduced significantly, increasing asset utilization and revenue from that cell. 

Let’s Start Something new

Say Hello!

Get in touch with us. We’re happy to answer all of your questions and point you in the right direction.